Slogging on...(18 - 24 May)

Now that the plumber has done his thing Mark got stuck into getting the ensuite ready for tiling.
  • Glued the concrete floor sheets down - 2 layers, plus another layer under the floor over each join. It shouldn't move anywhere!
  • Measured, cut and glued the wall sheets on
Sat - Simon arrived at 8am and had completely tiled & grouted the walls and tiled the floor by 3pm. Amazing and it looks fantastic! He will be back on Monday to grout the floor...then we can install the fittings.


Comments

Popular posts from this blog

Dad's 80th...(9th - 12th April)

Water tight at last...(11 - 17 May)

Floor & ceiling joists...(20th - 26th April)